EasyManua.ls Logo

Wallace Perimeter Security ALPHA - Page 13

Default Icon
182 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Alpha/Delta (Kinetic Operator) Installation and Maintenance Manual Revision 1 - MAY 2023
13
ALPHA/DELTA INSTALLATION & MAINTENANCE CHECKLIST
ALPHA/DELTA INSTALLATION AND MAINTENANCE
CHECKLIST
Checked Good Needs
Aenon
N/A
Kinec Operator
Serial Number:
1-MECHANICAL
1� Target Magnet
Should be mounted in proper posion on the
gate beam, so that the gate travel is stopped
electronically (so stop), before it stops
mechanically. Magnet should be approximately 3"
past proximity switch when gate is at fully closed
posion. The gate should not hit the back of the
run-on-plate, nor should it squish the rubber
bumper. Appropriate gap between the leading
edge post and the bumper is 1/4" to 1/2".
2� Run-on Plate
Make sure that the run-on-plate is mounted in the
proper locaon on the catch portal. It should not
sit too low, so that the gate leaf is suspended in the
air, nor should it be mounted too high, so that the
gate rides up the enre run-on-plate. The run-on-
plate should only support about 15 lbs/7kg of the
total weight of the gate, keeping it from bouncing
in the wind, when fully closed. The leading edge
post should engage/contact the run-on-plate
approximately halfway up the plate.
3� Beam Joint(s)
Make sure there is no gap or bump in between
the two beams. Make sure beam is not sagging
or pulled laterally to one side. Beams that are not
aligned properly will cause the lower rollers to
wear out prematurely.
4� Boom Rollers
Check boom beam guide rollers for wear. Rollers
should be replaced every 2 to 3 years depending
on usage.

Table of Contents