Alpha/Delta (Kinetic Operator) Installation and Maintenance Manual Revision 1 - MAY 2023
81
INSTALLING THE EXTENDED BATTERY BACKUP KIT
2. Access the User Menu by pressing MENU
twice.
3. Access the Installer Menu by
simultaneously pressing OPEN and RESET.
Release the buons.
1. Start at a gate status display.
4. Use the NEXT buon to navigate to
the menu display. Change the seng
using the SELECT and NEXT buons.