EasyManua.ls Logo

WinGD X92 - Page 511

Default Icon
574 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance
93081/A1
Winterthur Gas & Diesel Ltd.
3/ 3
8) Make sure that the relief valve (2) is set to blow-off at 235 bar. This relates to a firing
pressure of between 166 bar to 169 bar.
9) Open the relief valve (6) on the HP oil pump to release the pressure in the hose
(94935).
10) Disconnect the hose and the HP oil pump from the relief valve (2).
11) Remove the relief valve (2) from the valve holder (94272C).
5. Installation
1) Apply Never-Seez NSBT to the thread of the relief valve (2).
2) Install the relief valve (2, ) to the adapter (4).
3) Close the indicator valve (1).
Relief Valve: Blow-off Pressure Check
2015

Table of Contents

Related product manuals