EasyManuals Logo

Agilent Technologies 1290 Infinity II 2D-LC User Manual

Agilent Technologies 1290 Infinity II 2D-LC
395 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #323 background imageLoading...
Page #323 background image
2D-LC User Guide 323
12 Maintenance
Correcting Leaks
Correcting Leaks
Correcting Leaks (G7116B)
1 Remove the door.
2 Use a pipette and tissue to dry the leak sensor area.
3 Observe the capillary connections and the column switching valve for leaks
and correct, if required.
4 Reinstall the door.
Correcting Leaks (G1170A)
1 Use a pipette and tissue to dry the leak sensor area.
2 Observe the capillary connections and the valve for leaks and correct, if
required.
When
If a leakage has occurred at the heat exchanger or at the capillary connections or at the column
switching valve.
Tools required Description
Tissue
Pipette
Wrench, 1/4 – 5/16 inch
(for capillary connections)
When
If leakage has occured at the capillary connections or at the valve.
Tools required Description
Tissue
Pipette
Wrench, 1/4 – 5/16 inch
(for capillary connections)

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Agilent Technologies 1290 Infinity II 2D-LC and is the answer not in the manual?

Agilent Technologies 1290 Infinity II 2D-LC Specifications

General IconGeneral
BrandAgilent Technologies
Model1290 Infinity II 2D-LC
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals