EasyManua.ls Logo

Agilent Technologies 4150 TapeStation system - Exchange the Electrode Cartridge

Agilent Technologies 4150 TapeStation system
228 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Agilent 4150 TapeStation System Manual 135
Maintenance
9
Electrode Cartridge
Exchange the Electrode Cartridge
Beyond the descriptions in this user guide you will also find a detailed and
animated description within the Agilent Information Center (see “Agilent
Information Center” on page 60).
1 During a preventive maintenance service the Electrode Cartridge is
exchanged. For details, see “Electrode Cartridge” on page 130.
2 Prepare the instrument by navigating to SettingsMaintenance, and Change
Electrode Cartridge. Follow further onscreen instructions.
3 Open the lid.
CAUTION
Wrong position of the ScreenTape nest
Instrument or cartridge damage can occur
Use the TapeStation Controller software to prepare the Electrode Cartridge
exchange procedure.
Remove the Electrode Cartridge only when prompted by a software dialog.

Table of Contents

Related product manuals