74 Agilent 4150 TapeStation System Manual
6
Operating Instructions
Starting the Analysis
5 Note required consumables: A second ScreenTape device will be requested
during the run if the first ScreenTape device has insufficient free lanes.
Make sure a second ScreenTape device with sufficient lanes is available. A
time frame of 15 minutes applies once the TapeStation Controller software
prompts for this.
6 Make sure sufficient ladder is present.
7 Start the run.
8 Confirm tip waste is empty. Confirm tube strip lids are removed and
proceed.
9 Presence of components such as tube strip lids, tips, and ScreenTape
devices are checked.


NOTE
A check for properly inserted nest covers and correct movement of the lower nest cover is
done during the initialization phase prior to a run. In case of stopped runs, refer to
Assembling Nest Covers on page 156, “Insertion of the Lower Nest Cover on page 158
and “Software Messages” on page 167 for further information.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Agilent Technologies 4150 TapeStation system and is the answer not in the manual?

Agilent Technologies 4150 TapeStation system Specifications

General IconGeneral
BrandAgilent Technologies
Model4150 TapeStation system
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals