Cleaning, maintenance and repairs
106
GreenDrill BAH0054-9 11.17
8.1 First operation
Tighten all bolted connections after approx. 20 operating hours, then check these connections every
250 operating hours.
8.2 Cleaning
1. Empty the seed hopper and metering units.
2. Remove the seeding shaft to thoroughly clean the metering unit.
3. Blow out the seed hopper and metering unit with compressed air or dry clean it with a paintbrush.
4. Clean only the outside of the seed hopper with water or a high-pressure cleaner.
DANGER
Dressing dust is toxic and must not be inhaled or come into con-
tact with the body.
When emptying the machine and removing dressing dust, e.g. with
compressed air, wear a protective suit, face mask, safety goggles and
gloves.
Blow out the seed hopper and the metering units with compressed air.
Water may not enter the seed hopper or the metering units.
Empty and clean the metering unit after use.
In metering units that are neither emptied nor cleaned,
a viscous to solid mass may form there is water enters under the
metering roller. The metering roller is braked strongly and
deviations may occur between the pre-set and actual seed rates.
seed residues and fertiliser may swell or germinate in the
metering units. As a result, rotation of the metering rollers is
blocked and damage can be caused to the drive!
Always observe the following points when using a high pressure
cleaner:
Do not clean any electrical components.
Always maintain a minimum nozzle distance of 300 mm between
the high-pressure nozzle and the implement.
Observe the safety regulations for working with high pressure
cleaners.