EasyManua.ls Logo

Amazone GreenDrill GD200-E - Preparing the Implement for Calibration or for Emptying the Seed Hopper

Amazone GreenDrill GD200-E
118 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Settings before commissioning
46
GreenDrill BAH0054-9 11.17
5.6 Preparing the implement
for calibration or
for emptying the seed hopper
1. Release the star handles (1) and remove
the calibration plate (2).
2. Release the star handle (1), push up the
chute (2) and re-fasten.
3. Fasten the collection bag (3) on the chute to
collect the seed.
4. Perform the calibration test, as described for
Control terminal 3.2 (see section 6.4, page 54)
Control terminal 5.2 (see section 7.6,
page 69)
5. Empty the seed hopper, as described for
Control terminal 3.2 (see section 6.9, page 57)
Control terminal 5.2 (see section 7.16,
page 84)
6. The chute is reassembled in the reverse sequence.

Table of Contents

Related product manuals