GreenDrill control terminal 5.2
GreenDrill BAH0054-9 11.17
79
7.8 Hectare counter
Area calculation
is carried out using the "actual" forward speed values.
The control terminal must be connected
to the 7-pin tractor signal socket (see section 7.18.4.1, page 93) or
to the radar device (see section 7.18.4.3, page 95) or
to the GPS device (see section 7.18.4.4, page 96).
begins as soon as the seeding shaft starts rotating and the tractor starts moving.
7.8.1 Display of the areas / deleting part areas
1. Select the display with the buttons.
2. Confirm the selection with the
button.
The following are displayed
the total area [ha]
the part area [ha]
3. Press and hold the
button for 5 seconds to set the part ar-
ea to zero.
The total area cannot be reset.
7.9 Operating hours counter
The working hour counter shows the run time of the seeding shaft.
1. Select the display with the
buttons.
2. Confirm the selection with the
button.
The following are displayed
the total hours [h]
the daily hours [h]
3. Press and hold the
button for 5 seconds to set the daily
hours to zero.
The total hours cannot be reset.