GreenDrill control terminal 5.2
GreenDrill BAH0054-9 11.17
73
14. Select the display with the
buttons.
15. Confirm the selection with the
button.
16. Enter the desired duration
1)2)
for the calibration test with
the
buttons (e.g. 0.5 min).
17. Confirm the entry with the
button.
1)
Calibrate for 0.5 minutes
for seeds, e.g., wheat, barley, peas and large spread rates
Calibrate for 1.0 minute
for all seeds (standard)
Calibrate for 2.0 minutes
for fine seeds, e.g., rapeseed and phacelia.
2)
The "Calibration duration" menu item does not appear when
the GreenDrill has a calibration button (see section 7.6.3, page 74) and
the menu item "Calibration button available" (see section 7.20.10, page 104) is answered
with "YES".
18. Select the display with the
buttons.
19. Confirm the selection with the
button.
The calibration starts.
The seeding shaft begins to rotate (without blower fan).
The seeding shaft stops automatically after the set time
has elapsed.
Keep the calibration button (if available) pressed for the
duration of the calibration test. The seeding shaft stops
after the button is released.
Do not select a shorter duration for the calibration test
than specified above (see Point 16).