Index of Figures
4 Edition 09/2014 SPECORD S600 accessories
Fig. 15-20 Display and keys for temperature adjustment at the control unit ............. 62
Fig. 15-21 Temperature curve in the block and inside the cell for different cells ....... 63
Fig. 15-22 Heat exchanger – hose connections and compensation container .......... 64
Fig. 15-23 Heat exchanger – connections on the rear .............................................. 65
Fig. 16-1 Layout of the cartridge sipper system ...................................................... 68
Fig. 16-2 Flow cell with connected sample intake hose and pump hose ................ 69
Fig. 16-3 Complete hose kit for the cartridge sipper system ................................... 69
Fig. 16-4 Cartridge sipper system installed ............................................................. 70
Fig. 16-5 Measuring parameter configurations for the cartridge sipper system ...... 71
Fig. 17-1 Holder for solid samples .......................................................................... 74
Fig. 17-2 Installing the holder for solid samples in SPECORD S600 ...................... 74
Fig. 18-1 Absolute reflectance attachment ............................................................. 75
Fig.18-2 V- and W-shaped beam paths at the attachment .................................... 76
Fig. 18-3 Absolute reflectance attachment in the sample chamber ........................ 77
Fig. 19-1 Reflection attachment .............................................................................. 80
Fig. 19-2 Table tops for reflection attachment......................................................... 80
Fig. 19-3 Beam path in the reflection measuring attachment
(viewed from the front) ............................................................................. 81
Fig. 19-4 Reflection measuring attachment installed in the sample chamber ......... 81
Fig.19-5 Example for interference values at a reflection angle of
= 60° ........... 83
Fig. 20-1 Layout of the integrated sphere – Total view ........................................... 86
Fig. 20-2 Integration sphere in vertical and horizontal installation .......................... 87
Fig. 20-3 Screws for fastening the polychromator cover ......................................... 88
Fig. 20-4 Slit stop in front of polychromator ............................................................ 88
Fig. 20-5 Halogen lamp of integrating sphere ......................................................... 89
Fig. 20-6 Control unit installed in the SPECORD S600 .......................................... 90
Fig. 20-7 Optical path in transmission measurements ............................................ 92
Fig. 20-8 Optical path in reflectance measurements ............................................... 95
Fig. 20-9 Sample carrier with powdered sample ..................................................... 96
Fig. 21-1 Immersion sensor for transmittance......................................................... 98
Fig. 21-2 Adjustable holder to accept the optic fiber adapter .................................. 98
Fig. 21-3 Optic fiber adapter inserted in the sample chamber .............................. 100