1 Safety instructions
1.1 General notes regarding safety
5
Actuator controls
Manual AUMATIC AC 01.1/ACExC 01.1 Profibus DP
Standards/directives AUMA products are designed and manufactured in compliance with recog
-
nised standards and directives. This is certified in a declaration of incorpora-
tion and a declaration of conformity.
The end user or the contractor must ensure that all requirements with
respect to assembly, electrical connection, and commissioning at the place
of installation are met. They include among others:
.
Standards and directives such as: EN 60079 “Electrical apparatus for
explosive gas atmospheres"
Part 14: Electrical installations in hazardous areas (other than mines).
Part 17: Inspection and maintenance of electrical installations in hazard-
ous areas (other than mines).
.
Applicable configuration directives for fieldbus applications.
Safety instructions/
warnings
All personnel w
orking with this device must be familiar with the safety and
warning instructions in this manual and observe the instructions given.
Safety instructions and warning signs on the device must be observed to
avoid personal injury or property damage.
Qualification of staff Assembly, electrical connection, commissioning, operation, and maintenance
must be carried out exclusively by suitably qualified personnel authorised by the
end user or contractor of the plant.
Prior to working on this product, the staff must have thoroughly read and under-
stood these instructions and, furthermore, know and observe officially recog-
nised rules regarding occupational health and safety.
Work performed in potentially explosive atmospheres is subject to special regu-
lations which have be observed. The end user or contractor of the plant are
responsible for respect and control of these regulations, standards, and laws.
Commissioning Prior to commissioning, it is important to check that all settings are in com-
pliance with the requirements of the application. Incorrect settings might
present a danger to the application, e.g. cause damage to the valve or the
installation.
The manufacturer will not be held liable for any consequential damage. Such
risk lies entirely with the user.
Safe operation Prerequisites for safe and smooth operation:
.
Correct transport, proper storage, mounting and installation, as well as
careful commissioning.
.
Exclusively operate the device if it is in perfect condition while observing
these instructions.
.
Immediately inform about any faults and damage and allow for corrective
measures.
.
Observe recognised rules for occupational health and safety.
Protective measures The end user or the contr
actor are responsible for implementing required
protective measures on site, such as enclosures, barriers, or personal
safety equipment for the staff.
Maintenance Any device modification requires the consent of the manufacturer.

Table of Contents

Other manuals for AUMA Aumatic AC 01.1

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the AUMA Aumatic AC 01.1 and is the answer not in the manual?

AUMA Aumatic AC 01.1 Specifications

General IconGeneral
BrandAUMA
ModelAumatic AC 01.1
CategoryControl Unit
LanguageEnglish

Related product manuals