Chapter 71-00-00 Power Plant
71-00-01 General
For description see Chapter 01-10-00 General Engine Description
71-00-02 Instruction
An engine ground test run should be conducted after any work on the engine. After running the test,
the engine has to be inspected visually, especially the replaced and repaired engine parts.
Some work steps have to be performed when the engine is warm.
These work steps must be taken with utmost care.
Wrong maintenance of the engine can cause heavy engine damage even to engine
stop during aviation.
To award the warranty approved parts from the Austro Engine GmbH must be
used.