EasyManua.ls Logo

B&R Automation PC 620 - Page 518

B&R Automation PC 620
594 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
518
Maintenance / Servicing • Installing the UPS module
Automation PC 620 with 945GME N270 CPU board User's Manual V 1.10
Install UPS module with 2 Torx screws (T10) and 1 Torx screw (T10). Use the previously
removed Torx screws and one Torx screw from the mounting materials.
Plug in connection cable (see marked socket).
Figure 283: Install mounting bracket
Figure 284: Install UPS module
Figure 285: Plug in connection cable
Information:
When connecting the cable, make sure that the connector locking mechanism is
engaged.
Mounting bracket
+ 2 Torx screws

Table of Contents

Related product manuals