EasyManua.ls Logo

B&R Automation PC 620 - Page 529

B&R Automation PC 620
594 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance / Servicing • Installing the UPS module
Section 7
Maintenance / Servicing
529Automation PC 620 with 945GME N270 CPU board User's Manual V 1.10
Install mounting bracket on UPS module using 2 Torx screws (T10).
Install UPS module with 2 Torx screws (T10) and 1 Torx screw (T10). Use the previously
removed Torx screws and one Torx screw from the mounting materials.
Plug in connection cable (see marked socket).
Figure 309: Install mounting bracket
Figure 310: Install UPS module
Figure 311: Plug in connection cable
Mounting bracket
+ 2 Torx screws

Table of Contents

Related product manuals