Inspection intervals - maintenance notes
Manual b maXX
®
BM1000
Document No. 5.07003.04 Baumüller Nürnberg GmbH
104
of 174
9.3
m Main circuit
m Terminals and wiring of main circuit
m DC capacity of main circuit
m Resistor of main circuit
Check items Methods and criterion Maintenance period
Daily Half
year
One
year
If there are any loose or missing screws Tighten or replace the screw O
If machine or insulator is deformed, cracked,
damaged or with changed color change due
to overheating or ageing
Visual inspection
NOTE: Please ignore the color change of copper plate
O
If there is any dust or dirt Visual inspection O
Check items Methods and criterion Maintenance period
Daily Half
year
One
year
If the wiring shows change of color change
or deformation due to overheat
Visual inspection O
If the insulation of wiring is damaged or the
color has changed
Visual inspection O
If there is any damage Visual inspection O
Check items Methods and criterion Maintenance period
Daily Half
year
One
year
If there is any leakage of liquid, change of
color, cracks or deformation
Visual inspection O
Measure static capacity when required Static capacity ≥ initial value X 0.85 O
Check items Methods and criterion Maintenance period
Daily Half
year
One
year
If there is any peculiar smell or insulator
cracks due to overheating
Visual inspection, smell O
If there is any disconnection Visual inspection or measure with multimeter after
removing wiring between +1/+2 ~ -
Resistor value should be within ±10%
O