EasyManua.ls Logo

Belarus 820 - Page 276

Default Icon
381 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
80-0000010B OM
276
Table 6.1.1 – Types of scheduled technical maintenance
Types of technical maintenance Intervals, h
Technical maintenance during operating run-in
1)
TM before, during and after run-in
(after 30 hours of operation)
Shift-time (STM) 8-10
First technical maintenance (TM-1) 125
Additional technical maintenance (2TM-1) 250
Second technical maintenance (TM-2) 500
Third technical maintenance (TM-3) 1000
Special technical maintenance 2000
General technical maintenance As and when necessary
Seasonal technical maintenance (TM-SS и TM-
AW)
While transfer to autumn-and-
winter operation (TM-AW) and to
spring-and-summer (TM-SS)
Technical maintenance not coinciding with the
set intervals of TM-1, 2TM-1, TM-2, TM-3 and
special TM
Technical maintenance in special operating
conditions
During preparation of the tractor
operation in special conditions
Technical maintenance during storage
2)
In case of long-term storage
___________________________________________________________________________________________________________________________________________________________
1)
Data on the technical maintenance, carried out by the operator before, during and
after the tractor run-in are given in subsection 4.4 “Tractor final assembly and run-in”.
2)
Data on technical maintenance performed by the operator on long storage of the
tractor are shown in section 8 “Tractor storage” of this Manual.
Deviation of + 10% for TM-1, 2TM-1 and TM-2 and 5% for TM -3 from the set inter-
vals of TM are permitted (advancing or delayed TM) depending on the operating condi-
tions of the tractor.

Table of Contents

Related product manuals