156
FUEL SYSTEM
FUEL COMPONENT SERVICING
Tighten the center screws first and expand out-
ward. Tighten in stages to a final torque of 60 to
120 in. lbs. (7 to 13.5 N·m).
Install vapor separator vent hose and main bear-
ing vent hose. Secure with tie straps.
Install air temperature sensor, crankshaft position
sensor, and throttle position sensor electrical con-
nectors.
Connect throttle linkage.
IMPORTANT: DO NOT lubricate throttle link-
ages.
Refer to TPS Calibration on p. 118.
002501
1. Throttle linkage 002500