EasyManua.ls Logo

BRP EVINRUDE E-TEC E90DSLAA Series - Installation

BRP EVINRUDE E-TEC E90DSLAA Series
422 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
282
MIDSECTION
TILLER HANDLE SERVICE – LONG HANDLE
Carefully pull trim switch wires through inner tiller
handle as twist grip assembly is installed.
Install trim switch connector. Refer to CONNEC-
TOR SERVICING on p. 120.
Be sure the twist-grip's speed indicator line is
positioned with the speed range symbol on the
handle. Snap the grip into place.
Install stop switch assembly and connect to har-
ness.
Install bottom cover of tiller handle with seven
screws.
Installation
The steering arm can be positioned straight, or
angled 15° port or starboard by moving the adjust-
ment plate.
Place tiller bracket on steering arm from the bot-
tom. Thread steering arm screws, with washers,
into steering arm and tighten to a torque of 18 to
20 ft.lbs. (24.5 to 27 N·m).
1. Trim switch wiring 006677
1. Indicator line 006719
006713
1
1
1. Cover screw 006566
1. Plate adjustment for tiller in CENTER position. 005083
1. Screw 006361
1
1
1

Table of Contents

Related product manuals