EasyManua.ls Logo

BRP EVINRUDE E-TEC E90DSLAA Series - Page 30

BRP EVINRUDE E-TEC E90DSLAA Series
422 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
30
ROUTINE SERVICE
OETIKER CLAMP SERVICING
Clamp Installation
A constant stress should be applied to close the
ear clamps. This method ensures a positive stress
on the hose and does not result in excessive com-
pression or expansion of the band material.
IMPORTANT: Use only Oetiker recommended
tools to close Oetiker stepless clamps.
Oetiker pincers are available in the Evinrude/
Johnson Genuine Parts and Accessories Catalog.
Position correct size clamp over hose.
Install hose on fitting.
Close clamp ear fully with Oetiker pincers (pli-
ers).
Clamp Removal
Method 1: Position Oetiker pincers across clamp
ear and cut clamp.
Method 2: Lift end of stepless clamp with screw-
driver.
Method 3: Use Oetiker pincers (pliers) to grip
clamp. Pull clamp off of connection and discard.
DP0886
1. Open clamp
2. Closed clamp
000092
000108
000090
000091

Table of Contents

Related product manuals