Manuale operativo
CHORUS
Rev. 0 del 06/2012 35
The check continues, and the system controls the position of the strips and, if insertion/removal of the
strips is not correct, the window is displayed again for a new attempt. If after the sixth insertion/removal
operation of the strips the check is not executed correctly, the procedure is aborted.
Verification of point E) is performed by the instrument before starting the optic calibration, and if the
stand-by temperature is not ideal, a window appears showing the current temperature the ideal
temperature and the time available (30 minutes), after which calibration will not be performed.
fig. 27
ATTENTION
Pressing the Skip key allows the operator to skip this waiting period; in this case the optic calibration
will also be skipped (in case it was necessary), because the temperature is an indispensable function
for correct calibration.