– 49 –
FIGURES
Figure 1: Home Page 100
Figure 2: Front Panel Indicators 101
Figure 3: System Information 120
Figure 4: General Switch Information (ECS3510-52T) 121
Figure 5: Configuring Support for Jumbo Frames 122
Figure 6: Displaying Bridge Extension Configuration 124
Figure 7: Copy Firmware 126
Figure 8: Saving the Running Configuration 127
Figure 9: Setting Start-Up Files 128
Figure 10: Displaying System Files 128
Figure 11: Configuring Automatic Code Upgrade 132
Figure 12: Manually Setting the System Clock 134
Figure 13: Setting the Polling Interval for SNTP 135
Figure 14: Configuring NTP 136
Figure 15: Specifying SNTP Time Servers 137
Figure 16: Adding an NTP Time Server 138
Figure 17: Showing the NTP Time Server List 138
Figure 18: Adding an NTP Authentication Key 139
Figure 19: Showing the NTP Authentication Key List 139
Figure 20: Setting the Time Zone 140
Figure 21: Console Port Settings 142
Figure 22: Telnet Connection Settings 144
Figure 23: Displaying CPU Utilization 145
Figure 24: Displaying Memory Utilization 146
Figure 25: Restarting the Switch (Immediately) 148
Figure 26: Restarting the Switch (In) 148
Figure 27: Restarting the Switch (At) 149
Figure 28: Restarting the Switch (Regularly) 149
Figure 29: Configuring Connections by Port List 154
Figure 30: Configuring Connections by Port Range 155
Figure 31: Displaying Port Information 156