CHECK LIST AFTER INSTALLATION
With the MSC system, faults can be detected in the individual modules.
To ensure the trouble-free operation of the system, the following checks are to be under-
taken during setup and at least once a year:
1. Undertake complete system CHECK (see "CHECKING the system")
2. Check whether all cables are inserted correctly and the terminal blocks are tightened
properly.
3. Check whether all LEDs (indicators) illuminate correctly.
4. Check whether all sensors connected to the MSC system are positioned correctly.
5. Check whether the MSC system is properly fastened to the DIN rail.
6. Check whether all external indicators (lamps) function correctly.
After installation, maintenance or changing the configuration, undertake system
CHECK as described in section "CHECKING the system" on page 75.
>