CHAPTER 57
PAGE 9
PAGE DATE: 14. August 2015
MAINTENANCE MANUAL EXTRA 330LX
16 Perform an aileron rigging per Chapter 27-11-02.
17 Connect fuel system (tubes and vent lines), pitot/static sys-
tem, navigation/strobe light wires, ground bonding leads and
fuel indicator wires with prefitted connectors per respec-
tive Chapters. Connect instrument wet lines if MVP-50 is
not installed.
18 Reinstall breather line, canopy, engine cowlings and main
fuselage cover.