EasyManua.ls Logo

Fluke Versiv Series - Page 53

Fluke Versiv Series
377 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Versiv Series Cabling Certification Product Family
Users Manual
40
PROJECT: The project contains the settings for a job and helps
you monitor the status of a job. When you save test results, the
tester puts them in the project. Tap the PROJECT panel to edit
the project settings, select a different project, or make a new
project.
Shows a summary of the test results in the project:
: The number of tests that passed.
: The number of tests that failed.
: The number of tests with an overall marginal result.
The test setup panel shows the settings the tester will use
when you tap TEST or press . To change these settings,
tap the panel.
Note
You can set up tests for any module that the
tester can use, even when no module is attached.
Icons show the status of the Store Plot Data and AC Wire Map
settings. See Table 3 on page 47.
Next ID: The Next ID panel shows the ID that the tester gives
to the next test results you save.
Tap Next ID to do these tasks:
Enter an ID, select a different ID in the ID set, select a
different set of IDs, or make a new set. The tester adds the
IDs and ID sets you make to the project that shows on the
home screen.
Turn Auto Save on or off.
Operator: The name of the person who does the job. You can
enter a maximum of 20 operator names. For each operator you
can also enter the email address that the operator will use as an
ID to sign in to LinkWare Live.
www.GlobalTestSupply.com
Find Quality Products Online at: sales@GlobalTestSupply.com

Table of Contents

Other manuals for Fluke Versiv Series

Related product manuals