CHASSIS
- 300-
Oil Cooling System
INSTALLING OIL COOLING SYSTEM
1. To take a pressure resistance inspection to the
Oil Cooling System after maintain, the
pressure is 0.3MPA.
2. After take the pressure resistance inspection,
pass over 0.03MPA compressed air through
the connecting oil cooler, steel oil pipe and
Rubber Pipe for 3 minutes, do not leak.
3. According to the disassembly order, reverse
carries on the assembly.
4. When it is assemblied, pour the" L" engine oil,
then start the engine for 10 minutes to check
whether leaks. If it is not ,the Oil Cooling
System maintain is finish.