EasyManua.ls Logo

Huawei TaiShan 2280 V2 - Installing with L-Shaped Guide Rails

Huawei TaiShan 2280 V2
177 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 4-2 Spacing of 1U on a mounting bar of a cabinet
2. Fasten the lower end of a floating nut to the target square hole in a mounting bar at the
front of the cabinet.
3. Use a floating nut hook to pull the upper end of the floating nut, and fasten it to the upper
edge of the square hole. See Figure 4-3.
Figure 4-3 Installing a floating nut
4. Install a floating nut to the other front mounting bar in the same way.
Step 2 Install the L-shaped guide rails.
1. Position a guide rail horizontally in contact with the mounting bars in the cabinet.
2. Tighten the screws to secure the guide rail. See Figure 4-4.
TaiShan 2280 V2 Server
User Guide
4 Setup
Issue 01 (2019-07-01) Copyright © Huawei Technologies Co., Ltd. 57

Table of Contents

Related product manuals