Figure 4-2 Spacing of 1U on a mounting bar of a cabinet
2. Fasten the lower end of a floating nut to the target square hole in a mounting bar at the
front of the cabinet.
3. Use a floating nut hook to pull the upper end of the floating nut, and fasten it to the upper
edge of the square hole. See Figure 4-3.
Figure 4-3 Installing a floating nut
4. Install a floating nut to the other front mounting bar in the same way.
Step 2 Install the L-shaped guide rails.
1. Position a guide rail horizontally in contact with the mounting bars in the cabinet.
2. Tighten the screws to secure the guide rail. See Figure 4-4.
TaiShan 2280 V2 Server
User Guide
4 Setup
Issue 01 (2019-07-01) Copyright © Huawei Technologies Co., Ltd. 57