3-8 Keysight E5260/E5270 User’s Guide, Edition 6
Installation
Inspection and Installation
Inspection and Installation
This section describes what to do when you receive the instrument and accessories.
1. Inspect the shipment. See “To Inspect the Keysight E5260/E5270 and
Accessories”.
2. Verify the instrument operation. See “To Check the Keysight E5260/E5270
Operation” and “To Execute Diagnostics and Self-calibration”.
After the normal condition and operation are confirmed, install the instrument in the
place that satisfies the requirements described in the previous section.
To Inspect the Keysight E5260/E5270 and Accessories
Perform the following inspections when the instrument and accessories arrive at
your site.
1. Before unpacking any components, inspect all boxes for any signs of damage
that might have occurred during shipment, such as:
•dents
• scratches
•cuts
• water marks
If you suspect any damage, notify your local Keysight Technologies sales or
service office.
2. When you open the boxes that contain the instrument and accessories, check the
components against the contents lists attached to the boxes.
If anything is missing, notify your local Keysight Technologies sales or service
office.
To Check the Keysight E5260/E5270 Operation
1. Make sure that the Line switch is set to off.
2. On the instrument front panel, connect the Circuit Common terminal to the
frame ground terminal by using a shorting-bar.