© KWB – Kraft und Wärme aus Biomasse GmbH IM Easyfire 10/2008 Page 107
10 Fuel extractor, type S
10 Fuel extractor, type S
10.7 FE connection on the burner
Point 10.7 applies in the same manner for connectable FE systems (elbow worm, inclined worm, stirrer).
1.) Burner connection
Align the FE and boiler in such a manner that eject point and burner
connection are in line one above the other. Cut the connecting hose to
size and fasten it on the eject connection and on the burner connection
with the supplied clamps.
10 Burner connection
2.) Install the burner design cladding
The burner cladding is equipped with a key hole locking mechanism.
Screw the bolts into the press-in nuts of the side cladding and then
hook in the burner cladding.
This step concludes the installation of the burner cladding.
10 Design cladding
10.8 Final inspection
Ensure that ALL components and connections are correctly installed!
To conclude, ensure that the conveyor system is free of foreign objects!
MA-Easyfire 10.2008_EN.indd 107MA-Easyfire 10.2008_EN.indd 107 30.03.2009 13:30:51 Uhr30.03.2009 13:30:51 Uhr