Solid ceiling F90
Ceiling opening ; 10 cm (seal
after installation – trough is
acoustically decoupled)
Fire-safety collar
Drop hose ; 7.5 cm
Comply with floor load specifications!
Max. 25 °
Elbow worm Elbow worm
Pellet Stirrer Plus
Elbow worm
Pellet Stirrer Plus
Version with drop shaft
12.1 Pellet storage room requirements (FE type S with Pellet Stirrer Plus)
Comply with the instructions in points 1.3 and 1.3.2 in the introduction!
Enclose the conveyor trough with a rock wool shell for the wall penetration (acoustic insulation).
MA-Easyfire 10.2008_EN.indd 115MA-Easyfire 10.2008_EN.indd 115 30.03.2009 13:30:57 Uhr30.03.2009 13:30:57 Uhr