Page 136 IM Easyfire 10/2008 © KWB – Kraft und Wärme aus Biomasse GmbH
16 Suction conveyor, lance + buried tank
16 Suction conveyor, lance + buried tank
16.2 Lay out transport hose see point 13.3
16.3 Buried tank
The buried tank and its components are not included in the scope of delivery or services provided by KWB.
16.4 Final inspection
Ensure that ALL components and connections are correctly installed!
To conclude, ensure that the conveyor system is free of foreign objects!