2 System installation
2 SYSTEM INSTALLATION
The system parts must be installed by qualified personnel from KWB, or by KWB’s competence partner in
accordance with the set-up plan/submitted plan and the manufacturer’s instructions. The connection ( smoke pipe,
water, electrical) must be executed by certified HVAC engineers and electricians. This manual only describes the
boiler installation. Installation of the fuel extractor is described in separate manuals.
2.1 Installation of the boiler
2.1.1 Bringing in the boiler
The system is delivered ready to be plugged-in and can be brought directly into the room where it will be set up. Due
to the not inconsiderable weight of the boiler, we recommend preparing the transport path, e.g. cover stairs with
wooden planking or place steel pipes underneath the pallet as rollers, in order to more easily move the boiler in sliding
or rolling movements. Strictly ensure that you have implemented measures to prevent unintentional slipping.
2.1.1.1 Dismantling the system
If the system must be dismantled in order to bring it into the set-up room (door clearances are too small, transport
path is too difficult, etc.), or if a left/right conversion must be executed, then the following dismantling steps are
necessary.
1.) Open the cladding cover
Delivery variants:
Burner design cladding (Fig.)
Suction tank (type GL, GS) executed.
Lift the boiler cover.
Delivery status
2.) Remove the front cladding
Pay attention to the connecting cable!
Lift the front cladding out of the holder.
Lean the front cladding on the system with the outside facing the system.
This will prevent damage.
The connecting cable can only be detached after dismounting
the control unit cover, (connector 26).
Front cladding
3.) Dismount the boiler cover
Remove the insulating block.
Insulating block