3 Commissioning
Basic settings see 4.2
Boiler temperature see 4.2.1
Return flow boost see 4.2.2
Mixer return flow boost see 4.2.3
Pellet conveyor system see 4.2.4
Pump afterrun see 4.2.5
Boiler pump see 4.2.6
Language see 4.2.7
Second boiler see 4.2.8
Cleaning see 4.2.9
Hardware see 4.2.11
Network settings see 4.2.10
Boiler see 4.2.10.1
EXT 2 see 4.2.10.1.1
Power output see 4.2.10.1.2
Boiler-dependent see 4.2.10.1.3
Heating circuit see 4.2.10.2
DHWC see 4.2.10.3
Buffer see 4.2.10.4
Digital remote control see 4.2.10.5
Frost protection see 4.2.12
Outputs: see 4.2.13
Heating circuits see 4.1
Operating values see 4.1.1
Dependant on outdoor temperature see 4.1.2
If all parameters are set save them with the menu item 5.2 “Save / Delete” (see point 5.2).
The settings are now permanently saved. They will not be lost if there is a power failure.
3.3 Function check of the system parts
A complete relay test and network analysis is only possible after all settings have been made, particularly the
settings for the network components. To check the sensors and actuators and the communication of the network
components go through the function units in accordance with the following overview.
Relay test see 4.3
Boiler see 4.3.1
Heating circuits see 4.3.2
DHWC see 4.3.3
Buffer see 4.3.4
Fuel extractor see 4.3.5
Second boiler see 4.3.6
Network analysis see 4.4
Overview see 4.4.1
Boiler module see 4.4.2
Heating circuit module see 4.4.3
Dig. remote control unit see 4.4.4
MA-Easyfire 10.2008_EN.indd 44MA-Easyfire 10.2008_EN.indd 44 30.03.2009 13:30:06 Uhr30.03.2009 13:30:06 Uhr