EasyManua.ls Logo

KWB Easyfire - Page 20

KWB Easyfire
220 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
© KWB – Kraft und Wärme aus Biomasse GmbH IM Easyfire 10/2008 Page 21
2 System installation
2 System installation
Transfer the screws of the side cladding elements from the front
to the rear.
Transfer screws (1)
Transfer the following screws into the adjacent pressed-in nuts:
Screws for the burner cover
or
screws for fastening the suction tank
Transfer screws (2)
Assemble the boiler in the reverse sequence of steps 2.1.1.1 and 2.1.1.2.
MA-Easyfire 10.2008_EN.indd 21MA-Easyfire 10.2008_EN.indd 21 30.03.2009 13:29:53 Uhr30.03.2009 13:29:53 Uhr

Table of Contents

Other manuals for KWB Easyfire

Related product manuals