2 System installation
Adapt and mount the front cover.
7.) Mount the limit switch
The thread of the switch must seal flush with the hex nut.
Installation, limit switch
8.) Mount the cover panel
Thread the insulating plate onto the pipe of the cover panel.
Installation, cover panel
9.) Mount the cover panel
Slide the cover panel onto the openings of the lower frame of the boiler
door, from the front.
Tighten both hex nuts.
Position the sealing ring as shown.
Installation, cover panel
Adapting and installing the ash container.
10.) Adjust the set screw of the ash container
Adjust the height of the ash container with the set screw.
If the ash container is connected with the boiler the opening in the ash
container should be centred above the tube of the cover panel.
(This facilitates subsequent maintenance)
Set screw, ash container
11.) Mount the ash container
Slide the ash container over the tube of the cover panel.
Hook the two closure elements right and left into the cut-out of the cover
panel.
Close the tension locks.
Installation, ash container