9 Fabric tank
If this is not the case then push the fabric tank unit far enough until the location is right.
wrong
wrong
9
right
Final inspection
You must check the vertical supports and the horizontal supports
to ensure that they are also vertical or horizontal. If this is not
the case then for vertical supports compensate with metal plates
or strong wooden boards. Ultimately the vertical supports will be
anchored to the floor with frame bolts and floor plugs.
Fastening, base plates
After completely installing the fabric tank, you must re-check the following installation steps and correct any
installation defects that may have occurred.
Verification:
• Proper fastening of the bolts on the fabric tank !
• Proper fastening of the fabric tank on the floor!
• Proper placement of the vertical supports in the floor plates.
• Slightly loosen the bolts between the base plate and vertical support. Then check whether the vertical supports
are solidly seated on the base plates. Then retighten the screws.
• Check the inclination of the vertical supports with a water level
• Check the entire fabric tank frame for stability!
• Check whether the hanger loops of the fabric tank are centred!
• Ensure that the fill openings on the fabric tank that are not used are tightly sealed.
• Ensure that the fill tube is fastened in a stable manner!
• Verify that the fill nozzle on the filling tube is properly fastened by tightening the hose clamp!
• Verify that the fabric tank nozzle on the gate valve and removal system is properly fastened by tightening the
hose clamp!