7.1 Commissioning
Precondions
Mot
or has been commissioned
Motor control opmisaon has been completed
The user is f
amiliar with PC operaon via the interface "Internal Control".
This descripon is based on the Lenze sengs of the technology applicaon parameters.
Many of the system data required for the parameterisaon of the technology applicaons can
be found in the DSD dimensioning report.
Only a subset of the technology applicaon’s funcons are relevant to winding drives. Dene
the funcons that will be used for the applicaon to be acvated early on. This will make it
easier to handle the technology applicaon.
The topology presented in the following details the commissioning steps required for a
dancer-mounted rewinder with higher-level logic controller.
MM
R R
Controlword
Status signals
Control signals
Set tension
TA
Speed ontrolC
TA Winder
Dancer controlled
Sync. master value
Rewinder
Line velocity
0 ... 10 V
F
V
Fig. 32: Sample conguraon for Winder Dancer
Conguring the "Winder Dancer" TA
Commissioning
91