CAUTIONS WHEN LOADING/UNLOADING WITH CRANE
Be careful of the followings when loading or unloading the Machine
by hoisting with a crane.
• Do Not use those brackets on the boom to hang the whole unit.
• Before hoisting the Machine, attach the hoisting brackets (1) (for
instance shackles) to the outrigger rotary holes (four), and hang the
wire ropes (2) (four) on the hook (3).
• To hoist, use the crane, wire ropes (2) and hoisting bracket (1) (for
instance shackles) having enough strength against the Machine
mass (weight).
Following is the load force that applies to each of the wire ropes
when the Machine main body is hoisted by four wire ropes.
Standard specification: 975 kg
• ALWAYS set the Machine in the "traveling posture" and securely
insert the position pins (4 pieces) to the outrigger rotary parts before
hoisting the Machine.
The center of gravity position of the Machine has been decided
under the condition where the Machine posture was "traveling
posture".
See “Operation 2.5 Machine Travel Posture” for details.
• Use the carrying instruments shown the right figure and work safely
when carrying the Machine using a crane.
Recommended hoisting equipment
• Wire ropes (two in front): 12.5 diameter x length of 2150 mm
(breaking force of 7.5 t or more), with eye lock and nominal 12A
thimble at one end
• Wire ropes (two in back): 12.5 diameter x length of 1650 mm
(breaking force of 7.5 t or more), with eye lock and nominal 12A
thimble at one end
• Shackle: BC or SC, nominal 14