EasyManuals Logo

Manitowoc 16000 Service And Maintenance Manual

Manitowoc 16000
292 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #144 background imageLoading...
Page #144 background image
Reference Only
ELECTRIC SYSTEM 16000 SERVICE/MAINTENANCE MANUAL
3-18
Published 05-09-17, Control # 014-28
56-n EC1A Load Hoist (Drum 2) Motor Speed Sensor
1.2 or 3.2 Volts Not Moving;
2.2 Volts Moving
CAN52-2 *2
56-p EC1B Load Hoist (Drum 2) Motor Speed Sensor
1.2 or 3.2 Volts Not Moving;
2.2 Volts Moving
CAN52-2 *2
*1 – Lower four bits can be multiplied by 5 or 10 depending on sender, then divided by 16 for an estimation of sender voltage.
*2 – Number in indicated bank should increment in positive direction and decrement in negative direction with item rotation.
*3 –
Swing Lock removed on current production cranes.

Table of Contents

Other manuals for Manitowoc 16000

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc 16000 and is the answer not in the manual?

Manitowoc 16000 Specifications

General IconGeneral
BrandManitowoc
Model16000
CategoryConstruction Equipment
LanguageEnglish

Related product manuals