EasyManuals Logo

Manitowoc Grove GRT8120 User Manual

Manitowoc Grove GRT8120
448 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #156 background imageLoading...
Page #156 background image
OPERATING PROCEDURES GRT8120 OPERATOR MANUAL
4-26 Published 3-22-2021, Control # 702-02
Telescoping - Theory of Operation
The following section describes the internal operation of a
pinning boom.
The telescoping process requires locking and unlocking
processes in the main boom. The main boom can be
telescoped in different ways.
Manual Telescoping
For manual telescoping, the operator must initiate some
locking and unlocking processes at the right time.
Semi-automatic Telescoping
When telescoping with semi-automation, the operator enters
a telescoping sequence or “tele picture” and the Crane
Control System (CCS) controls all of the locking and
unlocking processes automatically. This mode can also be
used for intermediate lengths.
NOTE: For more information on telescoping with
semi-automation refer to Telescoping with
Semi-automation, page 4-38.

Table of Contents

Other manuals for Manitowoc Grove GRT8120

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GRT8120 and is the answer not in the manual?

Manitowoc Grove GRT8120 Specifications

General IconGeneral
BrandManitowoc
ModelGrove GRT8120
CategoryConstruction Equipment
LanguageEnglish

Related product manuals