Switch over the hoists as follows:
• Switch off both hoists by selecting no hoist indicator.
Switch on the auxiliary hoist indicator.
The hoist indicator will now be displayed above the auxiliary
hoist icon (1, Figure 4-194).
WARNING
Overload Hazard!
When operating the crane with two hoists reeved, ensure
that the hoist in use is identified in the RCL configuration.
Failure to do so may result in overload of the hoist line or
crane. Death or Serious Injury could occur.