EasyManua.ls Logo

Mazda 121 - Intake Manifold Assembly; Distributor and High-Tension Lead

Mazda 121
390 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ASSEi'BLY
Intake
Manltold Assembly
'l.
Remove all foreign material trom the intake manifold
con-
tact surtace.
2.
Install
a new
gasket
and the intake manifold
assembly.
Tighlening torque:
t9-25 Nm
(1.9-2.6
m-kg, 14-19 fub)
Distrlbutor and High-tension Lead
1. Apply
engine oil
to
the O-ring, and
position
it on the dis-
tributor.
2. Apply
engine oil to the blade.
3.
Install
the distributor with the blade fit into the camshaft
groove.
4. Temporarily, loosely
tighten the dist.ibutor
installing
boll.
5.
Connect the
high-tension
leads.
6. Adjusl the ignition timing after engine installation.
(Refer
to Section G.)
\=.\-6FY--.-
J
\ \\ .t.u
-
//t
\
\
B-81

Table of Contents

Related product manuals