EasyManua.ls Logo

Mazda 121 - Radiator Removal;Installation; Radiator Inspection

Mazda 121
390 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
RADIATOR
RADIATOR
REMOVAL
/
INSTALLATION
Caution
.
Eetore loosening
the radiator drain
plug,
verlty lhat the radiator d.ain hose tac€s straight
down,
.
Poallion the hose
damp in the
original localion on the hose, and squeeze the
clamp lightly
with large
pliers
to ensure
a
good
tit.
1
Disconnecl
lhe
negatrve
battery
cable.
2. Drain the engine coolant.
3. Remove in the order
shown in the figure.
4.
lnstall
in the reverse
oroer ol removal
r*n
{3o-1
ro cfrrg,
6F95
hrb)
1.
Cooling fan connector
2.
Coolant reservoir hose
3. Radialor hose
4. Oil cooler hose
(ATX)
5. Radiator bracket
6. Radiator
Inspection.....................................
page
E
7
7- Cooling fan
and
radiator
cowling assembly
INSPECTION
Check
for
the
tollowing
and repair or replace as necessary.
1. Cracks, damage, and water leakage.
2. Bent lins
(repair
with a screwdriver).
3. Distoned or bent
radiator
inlet.
Sleps Atter Installation
1. Fill the radiator with the specified amount
and
type
of en-
gine
coolant.
(Refer
to
page
E-4.)
2.
Connect the
negative
battery cable.
3. Start
the
engine
and
check
for leaks.
E-7

Table of Contents

Related product manuals