BATTERY CHARGING AND STARTING SYSTEMS
90-826883R2 JUNE 1998 Page 2B-25
Choke Solenoid
Installation
IMPORTANT: New gasket MUST be positioned as shown when being installed.
1. Install new gasket with solenoid plate assembly.
2. Secure assembly with 2 screws. Torque screws to 18 lb. in. (2.0 N·m).
53209
a
c
b
a - Gasket
b - Solenoid Plate
c - Screws [Torque to 18 lb. in. (2.0 N·m)]