Pellerin Milnor Corporation 59
Formula (F6) — Touch the Formula button to exit the Manual Override window and return
to the Home display. The bifold door must be closed, and the chute must be down.
BNCLDT02 / 2020403
BNCLDT02 0000249387 B.6 9/29/20 2:00 PM Released
4.5 Fault Recovery
BNCLDT02.C01 0000249550 E.2 B.6 B.3 9/17/20 11:57 AM Released
If the machine lost power or an error occurred while the machine was receiving a load, running a
formula, or discharging a load, follow these instructions to return the machine to automatic opera-
tion after you resolve the error.
4.5.1 The Loading Recovery Sequence
BNCLDO01.T03 0000248589 E.2 B.6 B.16 9/17/20 11:59 AM Released
If the machine lost power or an error occurred while the machine was receiving goods, follow
these steps.
1. On the Manual Override display, touch Load (F4).
NOTE: The machine must be in the load position (rear down, bifold door open, and
chute down) to use this function.
2. Touch
. The loading sequence will start when you push the Hydraulic Pump Enabled
button.
3. Push the Hydraulic Pump Enabled button to start the loading sequence.
a. The cold water valve opens.
b. The cylinder turns at drain speed.
c. The water valve closes when the water level reaches the level entered in the Wet-Down
configuration decision.
4. Load the machine.
5. When the machine is fully loaded, touch
. The loading sequence will end when you push
the Hydraulic Pump Enabled button.
6. Push the Hydraulic Pump Enabled button to end the loading sequence.
a. The water valves close.
b. Cylinder rotation stops after the time entered in the End Time configuration decision
expires.
c. The sewer remains closed.
7. Use the Bifold Door function (F1) to close the bifold door.
8. Continue to Section 4.5.3 , page 60.
Troubleshooting