EasyManua.ls Logo

NEC Storage M100 Series - Figure 6-14: Pool Bind - Completion

NEC Storage M100 Series
459 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Release 6.0 192
User Guide Chapter 6 Initializing a Disk Array (iSCSI)
6.2.3.3 Pool Bind - Completion
When the pool binding is successfully completed, the result of pool binding appears.
Figure 6-14: Pool Bind - Completion.
Perform the following steps:
1. Click Bind hot spare to bind a hot spare.
2. If you do not want to bind a hot spare, click Bind logical disk to move on to logical disk binding.
Parameter Description
Bind another pool Click this hyperlink to reopen the Pool Bind page to bind
another pool.
Bind hot spare Click this hyperlink to open the Hot Spare Bind page.
Bind logical disk Click this hyperlink to open the Logical Disk Bind page.

Table of Contents

Related product manuals