EasyManuals Logo

netAlly ETHERSCOPE nXG User Manual

netAlly ETHERSCOPE nXG
820 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #252 background imageLoading...
Page #252 background image
TruePower™
TruePower validates that the Switch (Power
Sourcing Equipment) and cabling can provide
the requested power under load by applying a
load equivalent to the selected class to mimic a
Powered Device (PD). Tap the toggle button to
enable the TruePower feature.
General Settings that Affect PoE
See the Wired section in General Settings for
descriptions of the Test PoE before Link and
Charge Battery via PoE settings, which also
affects the PoE Test and function.
Wired Connection Settings
Open Wired Connection settings to configure
speed/duplex, link persistence, user-defined
AutoTest App and Profiles
252

Table of Contents

Other manuals for netAlly ETHERSCOPE nXG

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the netAlly ETHERSCOPE nXG and is the answer not in the manual?

netAlly ETHERSCOPE nXG Specifications

General IconGeneral
BrandnetAlly
ModelETHERSCOPE nXG
CategoryTest Equipment
LanguageEnglish

Related product manuals