EasyManua.ls Logo

netAlly ETHERSCOPE nXG

netAlly ETHERSCOPE nXG
820 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Running a Performance
Test
Note the following before running:
l
The Performance Test can only run from the
Wired Test Port (top RJ-45 or Fiber port), and
an AutoTest Wired Profile must connect suc-
cessfully to establish link on the port. If you
receive a Status message such as "The wired
test port is not linked" or "No IP address"
but you have an active network connection,
go to AutoTest and run a Wired Profile to
troubleshoot your connection.
l
All configured Performance Test Services are
tested at the same time. If one Service fails
to meet the thresholds for the test, the entire
test fails.
l
Only four Services can run at once. If you
have selected more than four Services in the
Performance Settings, the test fails with the
Status message, "Too many services enabled
(56)."
Performance Test App
718

Table of Contents

Other manuals for netAlly ETHERSCOPE nXG

Related product manuals