Punch Unit Installation (D570)
D129/D130 2-48 SM
5. Remove the shipping retainer [A] ( x 2) from the punch unit.
6. Move the punch unit [A] along its rails into the finisher. Make sure that the pin engages
correctly at the front and rear.
7. Connect the cables [B] of the finisher to the connectors (CN601 and CN602) on the punch
unit board (
x 2, x 1).
The cables [B] are coiled and attached to the PCB.