Project planning of indication and operation devices
Operation and indication devices
5
37 |
Building Technologies
Figure 5: An example of the optional display and operating concept with the FC2080
Interfaces and ↑ visibility of the operation and indication devices
The table below shows the interfaces to which the individual operation and
indication devices are connected, and how the visibility can be configured.
Operation and
indication devices
Connection Supply via Visibility (configurable)
Fire control panel
↑ System bus
(↑ FCnet/SAFEDLINK)
Station-internal power
supply
● Max. five ↑ stations have
system-wide visibility
2
● All other stations have a visibility
of no more than any other two
stations
Fire terminal
System bus
(FCnet/SAFEDLINK)
● External 24 V supply
● Station-internal
power supply
(optional)
Fire terminal (Touch) Station-internal bus
Station-internal supply
4
or external DC supply
Same visibility as station
LED indicator
(internal)
Station-internal bus Station-internal supply
4
System-wide
LED module Station-internal bus Station-internal supply
4
System-wide
Event printer
(internal)
Serial port RS232 Station-internal supply
4
System-wide
Event printer
(external)
Serial port RS232 External supply System-wide
10 zones EVAC-NL
operation [NL]
Station-internal bus Station-internal supply
4
10 zones, system-wide
FC2080
DC 24 V
FCnet/SAFEDLINK
Card cage
(5 slots)
FCA2008
Operating unit
Card cage
(CPU)
FCA2003
Control unit (19", FC2080) FCC2002
Operating add-on
Operating add-on